Iowa DOT Home 511 Logo
Major Delays Road Work Winter Conditions All Advisories NWS Forecasts NWS Alerts Road Restrictions



About 511

Newsroom

Contact

Links

Site Map

511 Hints

Iowa DOT

State of Iowa

Click Here for Des MoinesDes Moines Metro Trip Guide

Your feedback is needed for a
short, anonymous
opinion poll
Click Here



Click Here To Learn More About:Rules of the Road



 All Current Incidents.   Text Only   High Bandwidth Version
Click or move mouse over icons to get more information
Accident Difficult Driving Conditions Roadwork
Alert Fair Driving Conditions Permit Status
For Des Moines information, click on the Zoom box on the map or select Des Moines from the drop down menu.
All Current Incidents.
Closure - US 6
US 6 in both directions: from County Road V16 to County Road V18
road closed to traffic — until November 20
Comment: Poweshiek County. US 6 will be closed June 22 for the reconstruction of the Bear Creek bridge located 4.0 miles East of US 63 between Poweshiek County roads V 16 and V 18. Detour will use US 63, I-80 and IA 21. Road is expected to reopen November 20, 2009. Marshalltown RCE Office 1-800-251-2706.

last updated October 7
 
Closure - US 18
US 18: from IA 51 to County Road W64
road closed to traffic, parade on Wednesday — starting 4:00 PM, 11/11/09 until Wednesday, at about 5:00 PM CST
Comment: Allamakee County: The City of Postville is having a parade in the downtown area to commemorate Veterans Day. Detour set up by the city. For further information contact Kathie Rustad at 382-3631.

last updated November 4
 
Closure - US 52
US 52: from County Road X47 to IA 128
road closed to traffic, parade on Wednesday — starting 11:30 AM, 11/11/09 until Wednesday, at about 1:30 PM CST
Comment: Clayton County: The city of Garnavillo is having a parade to commemorate Veterans Day. Detour set up by the city. For further information contact Kathie Rustad at 382-3631.

last updated November 4
 
Closure - Iowa 51
Iowa 51: from US 18 to IA 9
road closed to traffic, parade on Wednesday — starting 4:00 PM, 11/11/09 until Wednesday, at about 5:00 PM CST
Comment: Allamakee County: The city of Postville is having a parade in the downtown area to commemorate Veterans Day. Detour set up by the city. For further information contact Kathie Rustad at 382-3631.

last updated November 4
 
Roadwork - Iowa 24
Iowa 24: at US 18
road construction, road closed to traffic — until tomorrow at about 4:00 PM CST
Comment: Chickasaw County. IA 24 in New Hampton from Linn Avenue east to just east of Water Avenue is closed for reconstruction. Traffic will be routed in New Hampton on Milwaukee Street and N. Pleasant Hill Avenue. Please follow detour route signs and use caution when traveling the local city detour streets. New Hampton RCE Office - 800-373-7343.

last updated October 28
 
Closure - US 275
US 275 in both directions: after I-29
road closed due to bridge construction work
Comment: Highway US-275/IA-92 Bridge over the Missouri River will be closed for nine months beginning September 8, 2009. The closure is necessary to complete construction of the new bridge and the demolition of the old bridge. Marked detour US-275/IA-92 to 24th Street to Interstate 80 to 13th Street in Nebraska to US-275/N-92

last updated September 18
 
Closure - Iowa 12
Iowa 12: from County Road K18 to before IA 3
road closed to traffic due to road construction work -- detour in operation — until November 17
Comment: Plymouth County: IA 12 traffic will be closed while a slide repair is performed approximately 7 miles north of the Woodbury County Line. The IA 12 detour is Plymouth County Road K-18 north to Plymouth County Road C38 and then west on C38 until IA 12. Sioux City RCE 1-800-579-2713

last updated October 30
 
Roadwork - Iowa 3
Iowa 3: at US 169
road construction, bridge closed -- detour in operation — until November 25
Comment: Humboldt County - Bridge 1.6 miles west of US 169 closed for reconstruction. Detour starts at County Road P33. North on P33 for two miles to C29, east on C29 for approximately 3 miles to Iowa 169, and south on Iowa 169 for two miles back to Iowa 3. Cherokee RCE 1-800-579-2712.

last updated September 8
 
Roadwork - Iowa 12
Iowa 12: at I-29
road construction, road closed —
Comment: Woodbury County: Northbound I-29 traffic can use Exit 151 Riverside Boulevard to access IA 12 northbound. Southbound Riverside Boulevard is closed at Interstate 29. Sioux City RCE 1-800-579-2713

last updated September 28
 
Closure - Interstate 29
Interstate 29 northbound: at Exit 95 County Road F20
exit ramp closed because of construction work —

last updated September 23
 
Closure - Interstate 29
Interstate 29 in both directions: at Exit 135 County Road D51
exit ramp closed because of bridge maintenance work —
Comment: County Road D51 over I-29 in Woodbury county is closed in both directions due to DOT emergency bridge inspection. Unknown when road will re-open. Motorists are advised to use alternate routes.

last updated August 5
 
Closure - Interstate 80
Interstate 80 in both directions: at Exit 306: US 67
roadway reduced to one lane because of bridge maintenance work —
Comment: Scott County. I-80 eastbound and westbound traffic is reduced to one lane at the Mississippi River Bridge. Through traffic should use either I-280 or I-74. It is unknown at this time when all lanes will be reopened.

last updated September 25
 
Closure - US 30
US 30 in both directions: between I-29 and County Road F58
roadway reduced to one lane because of road maintenance activities — until Monday, at about 6:00 PM CST
Comment: US 30 will be reduced to a single lane in both directions near mile marker 11 at East St. Clair St. due to road culvert repairs. Motorists are advised to watch for maintenance crews, equipment, and to obey traffic control. Area of work is within Harrison county.

last updated October 5
 
Closure - US 65
US 65 in both directions: from IA 3 to County Road C31
road closed to traffic due to road construction work — until November 30
Comment: Franklin County. PCC Pavement - Grade/Replace work on US 65 from IA 3 north to 19th Avenue in Hampton. Detour in operation. Traffic will be routed west one mile on IA 3 to Olive Avenue then north 2 miles to 170th Street then back east to US 65. District 2. Britt Construction Office, Roy A. Gelhaus, 1-800-373-7344. STP-065-7 - -2C-35

last updated yesterday at 10:08 AM CST
 
Closure - Iowa 4
Iowa 4 in both directions: from County Road B14 to IA 9
road closed to traffic due to road construction work — until November 13
Comment: Emmet County. IA 4 is closed from the South city limits to IA 9 due to construction. Traffic is detoured West and North on S. 1st Street to IA 9 and then back East to IA 4. Roy A. Gelhaus, Britt Construction Office, 1-800-373-7344. STPN-004-6 - -2J-32

last updated November 2
 
Closure - Iowa 38
Iowa 38: at IA 130
roadway reduced to one lane, single line traffic - alternating directions because of construction work — until November 15
Comment: Cedar County: Iowa 38 is reduced to one lane, single line traffic alternating directions from 9th, 10th, and 11th St. in Tipton due to road construction. The closure is expected to last until November 15th. Use caution and expect delays.

last updated October 14
 
Roadwork - Interstate 35
Interstate 35 in both directions: from Exit 36: IA 152; County Road R35 to Exit 56: IA 92
road construction, roadway reduced to one lane, speed restrictions in force Advisory speed limit 55 MPH — until November 13
Comment: Warren County: Road construction on I-35, reduced to one lane in both the northbound and southbound lanes. Speed limit is 55 MPH in work zone. Chariton RCE Office 1-800-881-5778.

last updated October 30
 
Roadwork - Interstate 35
Interstate 35 in both directions: from after Exit 56: IA 92 to before Exit 65 County Roads G4R and G14
bridge construction, roadway reduced to one lane — until Monday, at about 6:00 PM CST
Comment: Warren County: Bridge construction on I-35 over Badger Creek . I-35 will be reduced to one lane in both the northbound and southbound lanes. Chariton RCE Office 1-800-881-5778.

last updated October 16
 
Roadwork - Interstate 74
Interstate 74 in both directions: from Exit 298: I-80 to Exit 4: US 67; Grant Street and State Street
road construction, night time construction work, roadway reduced to one lane, width limit in effect, delays Width limit 12 ' 0 " on weekdays and Sundays — until December 31
Comment: Scott County, Asphalt Resurfacing with Milling. Lane closures will be permitted from 7:00 PM to 6:00 AM beginning at 7:00 PM Mondays, and ending at 6:00 AM on Fridays. Lane closures will also be permitted from 9:00 PM on Sundays, to 6:00 AM on Mondays. Lane closures outside of these hours will not be permitted. Davenport Construction, 1-800-262-5145.

last updated July 22
 
Roadwork - Interstate 74
Interstate 74 in both directions: from Exit 2: US 6; Spruce Hills Drive to US 6
bridge construction, night time construction work, roadway reduced to one lane, road closed intermittently, delays on weekdays — until December 31
Comment: Scott County, Lincoln Rd Bridge Replacement over I-74, 1.6 miles W. of the Mississippi River in Bettendorf. Lincoln Rd. will be closed to all traffic and diverted to local roads. Lane closures permitted on I-74 from 7 PM to 6AM Monday through Friday. Deceleration/Acceleration lanes may be closed 9 AM to 3 PM. There will also be 20 minute Total Closures Intermittently between the normal restricted hours for bridge replacement and Dynamic Message Signs being installed in the same general area. Davenport Construction, 1-800-262-5145.

last updated August 6
 
Roadwork - Interstate 80
Interstate 80: from after Exit 164: US 6 to before Exit 173: IA 224; County Road T22
road construction, roadway reduced to one lane — until Tuesday, at about 10:00 AM CST
Comment: This project is on I-80 near Newton placing two dynamic message boards. Work can be completed anytime from Monday beginning at 12 am until 10 am on Friday. There will be single lane closures while work is being completed. Des Moines Construction Greg Mulder 1-800-251-2707

last updated October 2
 
Roadwork - Interstate 80
Interstate 80 westbound: at Exit 267: IA 38; County Road X54
bridge construction, roadway reduced to one lane, night time construction work, width limit in effect Width limit 12 ' 0 " daily — until September 13, 2010
Comment: Cedar County, Intermittent lane closures to eventually shift WB traffic onto the existing EB Bridge then back onto the WB lanes for reconstruction of WB Bridge. The intermittent lane closures will be allowed between the hours of 7 PM to 11 AM. Davenport Construction, 1-800 262-5145.

last updated August 4
 
Roadwork - Interstate 80
Interstate 80 in both directions: at Exit 292: IA 130; North West Boulevard
road construction, night time construction work, roadway reduced to one lane, ramp restrictions in force, width limit in effect, delays Width limit 11 ' 0 " on weekdays and Saturdays — until November 28
Comment: Scott County, There will be lane closures during night time hours only, beginning June 18. Lane closures will be from 7:00 PM to 6:00 AM each night Monday thru Thursday, beginning at 7:00 PM Monday and ending at 6:00 AM Friday. Lane closures on WB I-80 will also be permitted on Sunday night from 9:00 PM to 6:00 AM Monday. Also WB Ramp reconfiguration. There will also be 20 minute Total Closures intermittently between the normal retricted hours in the same general area to install Dynamic Message Signs. Davenport Construction, 1-800-262-5145.

last updated August 5
 
Roadwork - Interstate 380
Interstate 380 southbound: at Exit 18 Wilson Avenue
road construction, night time construction work, roadway reduced to two lanes, road closed intermittently daily — until November 27
Comment: Linn County, Dynamic Message Sign Installation southbound at Wilson Ave. Bridge in Cedar Rapids. A minimum of two through lanes of traffic at all times. Lane closures are not allowed between 6:00 AM and 8:00 PM from Monday through Friday. All other times are permissible as well. Davenport Construction 1-800-262-5145

last updated November 2
 
Roadwork - US 6
US 6 in both directions: from US 61 to I-74
bridge construction, night time construction work, roadway reduced to one lane, road closed intermittently, width limit in effect Width limit 12 ' 0 " on weekdays and Saturdays — until December 16
Comment: Scott County, Bridge & Approaches - US 6/Kimberly Rd. over Goose Creek. Two lanes of traffic will be maintained during peak hours. No daytime lane closures are allowed however there will be some lane closures at night. Through traffic on Eastern Avenue will not be allowed at night during placement of an asphalt overlay on Kimberly Road. Traffic will be detoured using East 39th Street and Kimberly Road. Davenport Construction 1-800-262-5145

last updated November 2
 
Roadwork - US 18
US 18 in both directions: from US 65 to County Road S56
road construction because the roadway is reduced to one lane Width limit 14 ' 0 " — until November 15
Comment: Cerro Gordo County. PCC Paving on US 18 near Co. Rd. S-56 , traffic will be reduced to one lane in each direction. Roy A. Gelhaus, Britt Construction Office, 1-800-373-7344 NHSX-018-5 - -3H-17

last updated yesterday at 10:34 AM CST
 
Roadwork - US 30
US 30 in both directions: from US 67 to US 67
road construction, roadway reduced to one lane, road closed intermittently, width limit in effect Width limit 12 ' 0 " daily — until December 15
Comment: Clinton County, Reconstruction US 30/67 and Liberty Ave. From Approx. 375' E. of 25th Place to Approx. 100' W of 4th Street in Clinton. There will be a temp. detour in place to 12 th & 13th Streets. The concern here is going to be for LONG LOADS making right or left hand turns onto ONE WAY Streets. Davenport Construction 1-800-262-5145.

last updated October 27
 
Roadwork - US 34
US 34 in both directions: from US 59 to County Road M37
road construction, roadway reduced to one lane, width limit in effect Width limit 12 ' 0 " on weekdays — until November 16
Comment: Montgomery County, Creston Construction 1-800-579-2720, Bridge Deck Overlay, road reduced to one lane, traffic signals in operation.

last updated November 2
 
Roadwork - US 34
US 34 westbound: at US 63
bridge construction, roadway reduced to one lane — until Monday, at about 5:00 PM CST
Comment: Wapello County: Bridge construction on US 34 westbound lane over the Des Moines River. Westbound lane will be reduced to one lane. Chariton RCE Office 1-800-881-5778.

last updated November 2
 
Roadwork - US 61
US 61 in both directions: at County Road F33
road construction, roadway reduced to one lane, road closed intermittently daily — until December 21
Comment: Clinton County, Revetment Project on US 61 along N. bank of the Wapsi River at the Scott Co. Line. Davenport Construction 1-800-262-5145.

last updated October 21
 
Roadwork - US 61
US 61 in both directions: at County Roads Y68 and E73
road construction, roadway reduced to one lane on weekdays and Saturdays — until November 20
Comment: Clinton County, 7.5 miles of New Asphalt Paved Shoulders being placed on US 61 from County Rd Y68 N. to 0.5 mile S. of County Rd. E55. Davenport Construction 1-800-262-5145.

last updated October 27
 
Roadwork - US 63
US 63: from IA 92 to IA 146
road construction, roadway reduced to one lane -- pilot car in operation, look out for flaggers — until Monday, at about 6:00 PM CST
Comment: Mahaska County: Road construction on US 63 from north corporate limits of Oskaloosa to south corporate limits of New Sharon. US 63 will be reduced to one lane with pilot cars in operation, watch out for flaggers. Chariton RCE Office 1-800-881-5778.

last updated November 2
 
Roadwork - US 65
US 65: from after IA 92 to before US 69
road construction, night time construction work, roadway reduced to one lane — until December 18
Comment: This is a HMA resurfacing with milling project on US 65/69 from 1.5 miles south of the NCL of Indianola north to the IA 5 interchange. No lane closures or work will be allowed on NB lanes from 6:30 am to 8:30 am and on SB lanes from 4:00 pm to 6:00 pm Monday thru Friday. Expect lane closures at any times outside those hours. Des Moines Construction Greg Mulder 1-800-251-2707

last updated July 9
 
Roadwork - US 69
US 69: from after IA 160 to before County Road F22
road construction, roadway reduced to one lane, width limit in effect Width limit 11 ' 0 " — until December 1
Comment: This project includes patching HMA pavement widening/ HMA resurfacing on US Highway 69 from N 36th St North 1.08 miles to N 54th St in Ankeny. One lane will be closed while working in area, however all lanes will be open at night except for the 2-3 nights of patching. Des Moines Construction Greg Mulder 1-800-251-2707

last updated August 11
 
Roadwork - US 69
US 69: from after County Road E57 to before County Road E23
road construction, night time construction work, roadway reduced to one lane — until December 1
Comment: This is a HMA Resurfacing and patching project on US 69 from Airport Rd north to S.16th St and from 500 ft north of 24th St north of Bloomington Rd in Ames. This project will be completed at night Sunday night through Friday morning except from 24th St to north of Bloomington Rd which will be 24 hrs 7 days. No lane closures will be left up when is no work being done. Des Moines Construction Greg Mulder 1-800-251-2707

last updated August 25
 
Roadwork - US 71
US 71: from IA 175 to County Road M50
road construction, roadway reduced to one lane -- pilot car in operation — until November 30
Comment: Sac County - On US 71 from Auburn west and north to the west junction of Iowa 175 one-lane traffic will be maintained with a pilot car operation in area where contractor is working. Lane width is 11 feet with granular shoulders. Cherokee RCE 1-800-579-2712

last updated November 2
 
Roadwork - US 218
US 218: from County Road V66 to IA 8
road construction, bridge construction, width limit in effect, road construction, bridge construction, roadway reduced to one lane, width limit in effect Width limit 14 ' 6 " — until November 30
Comment: Benton County/One way traffic will be controlled by traffic signals at the Pratt Creek Bridge using an on site detour. Traffic should be prepared to stop for the alternating traffic at the detour/Cedar Rapids Field Office 319-365-6986

last updated August 14
 
Roadwork - US 218
US 218 in both directions: from County Road B59 to US 18
road construction because the roadway is reduced to one lane — until November 13
Comment: Floyd County. HMA Resurfacing with milling work in both directions on US 218 Charles City By-Pass from south of Co. Rd. B-59 north to ICE Rail Link. Road will be reduced to one lane in both directions. Roy A. Gelhaus, Britt Construction Office 1-800-373-7344

last updated October 15
 
Roadwork - Iowa 1
Iowa 1: from I-80 to County Road F8W
road construction, roadway reduced to one lane Width limit 10 ' 0 " —
Comment: Johnson County/ Traffic reduced to one lane in both directions on IA-1 over I-80/Width Restriction 10' until further notice.

last updated October 6
 
Roadwork - Iowa 2
Iowa 2: at US 63
road construction, roadway reduced to one lane — until Monday, at about 6:00 PM CST
Comment: Davis County: Road construction, reduced to one lane on IA2/US 63 from the west junction of IA 2/US 63 to the east junction of IA 2/US 63. Chariton RCE Office 1-800-881-5778.

last updated November 2
 
Roadwork - Iowa 3
Iowa 3: from County Road M31 to US 71
road construction, roadway reduced to one lane -- pilot car in operation — until November 20
Comment: Buena Vista County - On Iowa 3 from 0.25 miles west of County Road M-31 east to US 71 traffic will be reduced to one lane in area where contractor is working. A pilot car operation will guide traffic through the construction zone. Available lane width is 11 feet with granular shoulder. Cherokee RCE 1-800-579-2712

last updated September 10
 
Roadwork - Iowa 24
Iowa 24: from US 18 to County Road W14
road construction, roadway reduced to one lane -- pilot car in operation, look out for flaggers — until November 25
Comment: Chickasaw County. Resurfacing work between New Hampton and Jackson Junction will include grading, shoulder work, and guardrail installation. Alternating lane closures will be necessary and traffic will be controlled with pilot cars and flaggers. Please use caution when traveling through the work zone. New Hampton RCE Office - 800-373-7343.

last updated yesterday at 9:37 AM CST
 
Roadwork - Iowa 26
Iowa 26: from IA 9 to County Road A26
road construction, shoulder closed, roadway reduced to one lane, temporary traffic lights -- look out for flaggers — until November 18
Comment: Allamakee County. Road construction work beteen Lansing and New Albin will involve shoulder closures and intermittent lane closures. Traffic will be controlled with signal lights and flaggers. Please use caution when traveling through the work zone. New Hampton RCE Office - 800-373-7343.

last updated August 18
 
Roadwork - Iowa 44
Iowa 44 in both directions: from IA 4 to US 169
road construction, roadway reduced to one lane, width limit in effect -- pilot car in operation, look out for flaggers Width limit 14 ' 6 " — until November 16
Comment: Guthrie County, Creston Construction 1-800-579-2720, reduced to one lane during daylight hours, Monday-Saturday only. Alternating lanes, for PCC Patching and HMA Resurfacing.

last updated October 26
 
Roadwork - Iowa 76
Iowa 76: from IA 9 to County Road A16
road construction, roadway reduced to one lane -- pilot car in operation, look out for flaggers — until November 13
Comment: Allamakee County - As part of the continuing road construction on IA 76 between Waukon and the Minnesota State Line, pavement markings will involve intermittent lane closures. Traffic will be controlled with flaggers and pilot cars. Please use caution when traveling through the work zone. New Hampton RCE Office - 800-373-7343.

last updated yesterday at 9:33 AM CST
 
Roadwork - Iowa 130
Iowa 130 in both directions: from County Road Y52 to I-80
road construction, roadway reduced to one lane, shoulder closed, width limit in effect, delays Width limit 12 ' 0 " on weekdays and Saturdays — until November 28
Comment: Scott County, Asphalt Overlay and shoulder widening on IA 130, there will be random lane and shoulder closures. Davenport Construction, 1-800-262-5145

last updated August 4
 
Roadwork - Iowa 143
Iowa 143: from IA 3; County Road L36 to IA 10
road construction, roadway reduced to one lane -- pilot car in operation, look out for flaggers — until Tuesday, at about 7:00 PM CST
Comment: Cherokee/O'Brien Counties - One-lane traffic will be maintained with a pilot car in area where contractor is working along the 10.77 mile project. Cherokee RCE 1-800-579-2712

last updated October 28
 
Closure - US 18
US 18 in both directions: at US 218; County Road T44
roadway reduced to two lanes, bridge construction Width limit 12 ' 0 " — until November 13
Comment: Floyd County. Bridge Deck Overlay work on US 18 / Brantingham Street Bridge over the Cedar River in Charles City. Traffic will be reduced to one lane in each direction. Roy A. Gelhaus, Britt Consruction Office, 1-800-373-7344. NHXS-018-6 - -3H-34

last updated November 2
 
Closure - US 63
US 63: from after County Road G55 to before IA 92
width limit in effect, roadway reduced to two lanes
Comment: Mahaska County. US 63 between Sheriff Avenue and Glendale Road restricted width to 11 foot lanes and reduced to one lane in each direction due to installation of bike trail culvert. City of Oskaloosa. 641-673-9431.

last updated October 6
 
Roadwork - Interstate 80
Interstate 80 in both directions: from Exit 244 Dubuque Street to before Exit 246: IA 1; Dodge Street
road construction, roadway reduced to two lanes, width limit in effect Width limit 12 ' 0 " — until November 15
Comment: Johnson County: On I-80 from just after Exit 242 to before Exit 246 grading and paving work will reduce traffic to two lanes of traffic in both directions, width restriction is 12 ft with 2 ft paved inside, 4 ft paved outside WB, and 10 ft. paved outside EB. Project IM-80-6 243--13-52 Manchester RCE 1-800-262-5146

last updated August 25
 
Roadwork - US 20
US 20: at Exit 227: US 63; Seargeant Road
road construction, lane closed — until November 13
Comment: Black Hawk County - Overhead traffic sign placement at U.S. 20 and U.S. 63 interchange will involve lane closures in the north and south bound U.S. 63 lanes. Please obey signs and arrow boards and use caution when traveling through the work zone. New Hampton RCE Office - 800-373-7343.

last updated October 28
 
Roadwork - US 30
US 30 in both directions: from US 63 to County Road V42
road construction, width limit in effect, single line traffic - alternating directions Width limit 16 ' 0 " on weekdays and Saturdays — until November 20
Comment: Tama-Benton Counties. HMA resurfacing on US 30 from K Avenue just East of Tama-Toledo to just East of the IA 21 intersection at Mile Post 218.22 will result in single line traffic alternating directions. Traffic through the work area will be controlled by a pilot car and flaggers. There will be one 12' lane and a 10' shoulder open in one direction with a 16' width restriction in effect. Work is scheduled to be done in the daytime Monday through Friday with some Saturday work possible beginning October 9, 2009, and scheduled for completion on November 20, 2009. Marshalltown RCE Office 1-800-251-2706

last updated October 8
 
Roadwork - US 61
US 61 in both directions: at County Road X23
road construction, roadway reduced to two lanes, width limit in effect Width limit 12 ' 0 " daily — until November 12
Comment: Lee County. Median work at Hwy. 61 and just North of Co. Rd. X-23. There will be 12ft width restrictions. Inside lanes will be closed to build a median crossover. Mt. Pleasant RCE. 1-800-224-6021.

last updated October 12
 
Roadwork - US 63
US 63: from US 30 to IA 96
road construction, single line traffic - alternating directions on weekdays — starting 7:00 AM, 11/09/09 until November 20
Comment: Tama County. Full depth patching operations on US 63 from US 30 to the IA 96 junction will result in single line traffic alternating directions controlled by pilot car and flaggers. Work will be done Monday through Friday during daylight hours from November 9 through November 20, 2009. Marshalltown RCE Office 1-800-251-2706.

last updated November 4
 
Roadwork - US 218
US 218: from IA 3 to IA 188
road construction, lane closed — until November 16
Comment: Bremer County - Intermittent lane closures on U.S. 218 from just south of IA 188 interchange and 200th Street will be necessary for milling, widening, and resurfacing work. Traffic will be controlled with arrow boards, cones, and signs. Please use caution when traveling through the work zone. New Hampton RCE Office - 800-373-7343.

last updated October 2
 
Roadwork - Iowa 13
Iowa 13: from IA 3 to IA 56
road construction, lane closed -- pilot car in operation, look out for flaggers — until November 20
Comment: Clayton County - Road construction between Strawberry Point and Elkader will involve intermittent lane closures for pavement patching work. Traffic will be maintained with flaggers and pilot cars. Please use caution when traveling through the work zone. New Hampton RCE - 800-373-7343.

last updated October 28
 
Roadwork - Iowa 14
Iowa 14: from County Road F17 to US 30
road construction, single line traffic - alternating directions -- pilot car in operation on weekdays — starting 7:00 AM, 11/16/09 until November 25
Comment: Marshall and Jasper counties. Full depth patching operations on IA 14 from US 30 to the county road F17 junction will result in single line traffic alternating directions controlled by pilot car and flaggers. Work will be done Monday through Friday with some Saturday work possible during the daylight hours from November 16 through November 25, 2009. Marshalltown RCE Office 1-800-251-2706.

last updated October 28
 
Roadwork - Iowa 92
Iowa 92 in both directions: at IA 1
bridge maintenance operations, single line traffic - alternating directions, width limit in effect Width limit 12 ' 0 " daily — until Monday, at about 6:00 PM CST
Comment: Washington County. Deck patching project. Located 2.5 miles East of Washington over S. Long Creek on Ia. 92. Width restriction will be 12ft. and will be reduced to one lane during daylight hours. Motorists are urged to watch for crews and equipment and obey traffic control signing.

last updated November 2
 
Closure - US 18
US 18 in both directions: between US 71; County Road B19 and US 71
left lane closed due to work on underground cables
Comment: Left lane of US 18 in Spencer closed in both directions between 8th and 18th st. , due to city repairs of underground cables. There will be a 12 foot width restriction in place. Motorists are advised to watch for crews, equipment, and to obey traffic control signing. Area of work is within Clay county.

last updated November 5
 
Roadwork - Interstate 29
Interstate 29 in both directions: from Exit 15 County Roads J26 and L31 to Exit 24 County Road J10 and L31
road construction Height limit 12 ' 0 ", Width limit 14 ' 4 " — until December 1
Comment: Fremont County. The north bound lane will be closed to construct new bridges and resurface I-29 with a concrete overlay in the north bound lanes. Traffic will be in a head-to-head situation in the south bound lanes. County road J-24, Exit 20, height limit 12 feet, width limit 14 feet 4 inches. The area is beneath the I-29 overpass.The Council Bluffs Resident Construction Engineer will administer these projects. Phone 1-800-579-2719.

last updated September 30
 
Roadwork - Interstate 29
Interstate 29 in both directions: from Exit 24 County Road J10 and L31 to Exit 32: US 34; IA 978
road construction, bridge construction — until December 1
Comment: Mills County. This situation is to construct the north bound bridge approximately four miles north of Exit 24, the Bartlett Exit. The traffic will be head-to-head in the south bound lanes. The traffic will be separated with vertical tubular delineators. The Council Bluffs Resident Construction Engineer will administer this project. Phone 1-800-579-2719.

last updated August 17
 
Roadwork - Interstate 29
Interstate 29 in both directions: from Exit 35: US 34; US 275 to Exit 42: IA 370; County Road H10
road construction, bridge construction Width limit 16 ' 0 " — until December 1
Comment: Mills County. The north bound lane will be closed for a portland cement concrete overlay plus the construction of a new bridge. This closure will start approximately three miles north of the north junction of I-29 and US-34, exit 35, north to the Pottawattamie County Line, approximately three miles north of the IA-370 interchange, exit 42. The traffic will be in a head-to-head situation in the south bound lanes of I-29. There will be a 16 feet width restriction in the head-to-head traffic situation. The Council Bluffs Resident Construction Engineer will administer this project. Phone: 1-800-579-2719

last updated October 29
 
Roadwork - Interstate 29
Interstate 29 in both directions: from Exit 61: I-680; County Road G37 to Exit 71: I-680
road construction, bridge construction, width limit in effect Width limit 13 ' 0 " — until December 1
Comment: Pottawattamie County. This is a bridge reconstruction project. The north bound bridge is being constructed. This is at approximate mile marker 66. The south bound lanes will be head-to-head traffic The north bound entrance ramp at Exit 66 will be closed during the bridge construction. The north bound exit ramp at Exit 66 will remain open. The Council Bluffs Resident Construction Engineer will administer this project. Phone 1-800-579-2719.

last updated August 21
 
Roadwork - Interstate 29
Interstate 29 in both directions: from Exit 71: I-680 to Exit 75: US 30
road construction, width limit in effect Width limit 13 ' 0 " — until December 17
Comment: Harrison County. The north bound and south bound bridges are being reconstructed approximately one half at a time. Traffic will be maintained through the construction zones in both the north bound and south bound lanes. Traffic will be channelized through the bridge areas with the use of temporary concrete barrier rails. Other traffic control devices will be in use through the construction zone. The regulatory speed through the construction zone will be 55 miles per hour. The Council Bluffs Resident Construction Engineer will administer this project. Phone 1-800-579-2719.

last updated August 17
 
Roadwork - Interstate 29
Interstate 29: from Exit 95 County Road F20 to Exit 112: IA 175
road construction, width limit in effect Width limit 15 ' 0 " —
Comment: Harrison/Monona Counties: Interstate 29 traffic is reduced to one lane and is head to head on southbound lanes from just south of the Little Sioux Interchange to just north of the IA 175 Interchange in order to reconstruct the Interstate 29 northbound lanes. I-29 traffic will have a width restriction of 15' 0". Sioux City RCE 1-800-579-2713

last updated September 24
 
Roadwork - Interstate 29
Interstate 29 in both directions: from Exit 112: IA 175 to Exit 127: IA 141; County Road K42
road construction, width limit in effect Width limit 15 ' 0 " daily — until November 15
Comment: Woodbury County. Traffic will be head to head in the northbound lanes from milepost 120 south of Whiting to milepost 127 south of Sloan for bridge construction. The Whiting SB exit ramp will be closed. Sioux City RCE 1-800-579-2713.

last updated July 27
 
Roadwork - Interstate 29
Interstate 29: from Exit 149 Hamilton Boulevard to Exit 151: IA 12; Riverside Boulevard
road construction —
Comment: Woodbury County: Road work on Interstate 29 continues between Exit 149 Hamilton Blvd and the South Dakota border. Interstate 29 northbound exit ramp to Exit 151 Riverside Boulevard is open. All other Riverside Boulevard ramps are closed. Sioux City RCE 1-800-579-2713

last updated September 28
 
Roadwork - Interstate 35
Interstate 35: from Exit 22 County Road J14 to Exit 33: US 34
road construction, opposing traffic sharing the roadway — until Wednesday, at about 6:00 PM CST
Comment: Clarke County: I-35 traffic will be head-to-head in the northbound lane from Exit 22 north to Exit 33 due to road construction. Chariton RCE Office 1-800-881-5778.

last updated October 22
 
Roadwork - Interstate 80
Interstate 80 in both directions: from Exit 1A: I-29 to Exit 40: US 59
road construction — until November 18
Comment: Pottawattamie County. This is a full depth patching project. One lane in each direction will be closed in the construction zone. Traffic will be maintained through the construction area with the use of warning signs, arrow boards, and channelizing devices. The posted speed limit through the construction zone will be 55 MPH. Patching within the city limits of Council Bluffs will be restricted to night work. The hours of closure of a lane within the city limits will be between the hours of 8:00 P.M. to 6:00 A.M. The Council Bluffs Resident Construction Engineer will administer this project. Phone: 1-800-579-2719

last updated October 15
 
Roadwork - Interstate 80
Interstate 80: from Exit 191: US 63 to Exit 205 County Road V38
road construction, width limit in effect, right lane closed Width limit 16 ' 0 " on weekdays — until November 20
Comment: Poweshiek County. Slide repair work on I-80 from the US 63 intersection to 1.59 miles East of the IA 21 intersection will result in intermittent right lane closures in both directions with a 16' width restriction from 12:00 AM Mondays through 10:00 AM Fridays. Work is expected to begin October 5 and end on November 20, 2009. Marshalltown RCE Office 1-800-251-2706

last updated October 30
 
Roadwork - Interstate 80
Interstate 80 in both directions: from Exit 225: US 151; County Road W21 to Exit 240: IA 965; Coral Ridge Avenue
road construction, night time construction work —
Comment: Iowa/Johnson County night time road construction both directions on mainline. Daytime ramp work.

last updated May 28
 
Roadwork - Interstate 80
Interstate 80 westbound: from after Exit 230 County Road W38 to before Exit 237 Ireland Avenue
road construction, speed restrictions in force Width limit 11 ' 0 " — until November 15
Comment: Johnson County/Bridge Repair on I-80 Westbound/There are two 11ft wide lanes with 2 ft wide shoulders. Oversized load vehicles must take the off-ramp before the bridge and then get back on with the on-ramp/Speed Reduced to 55 MPH until 11/15/09

last updated October 22
 
Roadwork - US 18
US 18 in both directions: from US 75 to IA 60
road construction, width limit in effect Width limit 16 ' 6 " on weekdays — until today at about 7:00 PM CST
Comment: Sioux County. Traffic will be reduced to one 16.5' lane controlled by flaggers and a pilot for HMA resurfacing with patching on US 18 from Hull to Sheldon. Sioux City RCE 1-800-579-2713.

last updated June 3
 
Roadwork - US 20
US 20 in both directions: from Exit 4: US 75 to County Road K42
bridge construction Width limit 14 ' 0 " daily — until November 15, 2010
Comment: Woodbury County. Traffic will be placed head to head in the Eastbound lanes and reduced to 14' for bridge construction over the Big Whiskey Creek. Both bridges will be replaced as part of this project and completion should be in November of 2010. Sioux City RCE. 1-800-579-2713.

last updated August 13
 
Roadwork - US 30
US 30 in both directions: between County Road P46 and County Road P54
bridge construction, road construction -- watch, follow special detour markers Advisory speed limit 35 MPH daily — until November 30
Comment: Greene County Work has been completed for the onsite detour, posted 45 mph traffic will take the short runaround detour while the contractor completes the replacement of existing bridge to a new triple box culvert between X Ave and Y Ave on Highway 30 approx. 2.6 miles east of Grand Junction, IA . Contractor Graves Constr. of Spencer Contact Jefferson RCE 1-800-251-2705

last updated October 23
 
Roadwork - US 30
US 30 eastbound: from IA 21 to US 218
road construction, width limit in effect Width limit 16 ' 0 " — until November 16
Comment: Benton County/Expect Signle line traffic alternating directions with width limit of 16'0" until 11/15/09/Traffic will be controlled by a pilot car and flaggers. There will be one 12' lane and a 10' open shoulder open in one direction./CRFO 319-365-6986

last updated September 9
 
Roadwork - US 65
US 65 in both directions: between IA 122 and County Road B20
bridge construction — until November 20
Comment: Cerro Gordo County. Bridge Replacement. US 65 traffic will use an on-site detour. Britt Construction Office. Roy A. Gelhaus 1-800-373-7344 BRF-065-8 - -38-17

last updated July 7
 
Roadwork - US 65
US 65 in both directions: from IA 9 to County Road A34
road construction Width limit 14 ' 0 " — until November 30
Comment: Worth County. PCC Paving and Grading work on US 65 from IA 9 in Manly north to Co. Rd. 105 in Northwood. Road closed to Detour. Detour route is east on IA 9 to Co. Rd. S-56 then north to Co. Rd. 105 then west to US 65. Roy A. Gelhaus, Britt Construction Office, 1-800-373-7344. STP-065-9 - -2C-98

last updated November 3
 
Roadwork - US 69
US 69: from IA 175 to before County Road D41
road construction -- pilot car in operation, look out for flaggers — until November 20
Comment: HMA Resurfacing Project From S. jct. IA 175 in Jewell N 2.6 miles Jefferson RCE 800-251-2705

last updated November 5
 
Roadwork - US 151
US 151: from I-80; County Road W21 to US 6
road construction, night time construction work —
Comment: Iowa/Johnson County night time work on mainline both directions. Daytime ramp work.

last updated May 28
 
Roadwork - US 169
US 169: at County Road D20
bridge construction, width limit in effect Width limit 12 ' 6 " daily — until November 20
Comment: Webster County Karl King Bridge Deck overlay project on IA Highway 926 through Fort Dodge oversize loads follow signs Contractor Christensen Bros of Cherokee Jefferson Construction 800-251-2705

last updated September 18
 
Roadwork - Iowa 17
Iowa 17: from after County Road E18 to before IA 175
road construction -- pilot car in operation, look out for flaggers on weekdays and Saturdays — until November 20
Comment: Boone County HMA Resurfaciong Project From Co Rd E-18 to IA 175 Jefferson RCE 800-251-2705

last updated October 23
 
Roadwork - Iowa 83
Iowa 83: from US 59 to IA 173
road construction -- pilot car in operation, look out for flaggers — until November 15
Comment: Pottawattamie County. This is a Hot Mix Asphalt widening and resurfacing project. One lane will be closed during the day light hours. Traffic control will be with the use of flaggers and pilot cars through the work zone areas. The Council Bluffs Resident Construction engineer will administer this project. Phone number: 1-800-579-2719

last updated October 29
 
Roadwork - Iowa 175
Iowa 175: from after US 169; County Road P61 to before IA 17
road construction -- pilot car in operation, look out for flaggers — until November 20
Comment: Webster County HMA Resurfacing Project 1.7 MI. W. of the DM River E. To S. Jct IA 17 Jefferson RCE 800-251-2705

last updated October 23
 
Roadwork - Iowa 175
Iowa 175: from IA 17 to before US 69
road construction -- pilot car in operation, look out for flaggers — until November 20
Comment: Hamilton County HMA Resurfacing Projec From N. Jct. Iowa 17 to S. Jct. US 69 Jefferson RCE 800-251-2705

last updated October 23
 
Road Restrictions - US 20
US 20: between County Road N65 and County Road P13
gross weight limit in effect No vehicles over 80000 lbs
Comment: Calhoun County - 40 ton maximum weight limit - bridge over West Cedar Creek, 5.3 miles east of Rockwell City.

last updated March 25
 
Road Restrictions - US 30
US 30 in both directions: between US 63 and County Road E66
height limit in effect Height limit 18 ' 0 " —
Comment: Tama County. New bridge over existing Highway 30 located 1/2 mile East of the US 63 intersection at Mile Post 203.1 has a height restriction of 18' 0". Marshalltown RCE Office 1-800-251-2706

last updated June 30
 
Road Restrictions - US 71
US 71: from after County Road D54 to before County Road D54
height limit in effect
Comment: Sac County - Permanent height restriction of 17 feet 7 inches at railroad crossing between these two county roads. Cherokee RCE 1-800-579-2712

last updated October 7
 
Road Restrictions - US 218
US 218 in both directions: between County Road W64 and County Road G36
height limit in effect Height limit 16 ' 0 " daily
Comment: Washington County. This is a new bridge going over Hwy 218. Mt. Pleasant RCE. Jeffrey Johnson. 1-800-224-6021.

last updated November 3
 
Road Restrictions - Iowa 1
Iowa 1: from US 34 to County Road H17
height limit in effect Height limit 18 ' 0 " —
Comment: Jefferson CO. Hwy 1 north of Fairfield mile post 25.9 new Trail bridge

last updated October 16
 
Road Restrictions - Iowa 2
Iowa 2: after US 61
width limit in effect Width limit 8 ' 0 "
Comment: Lee County - Permanent Width Limit

last updated December 8
 
Road Restrictions - Iowa 2
Iowa 2: after US 61
gross weight limit in effect No vehicles over 16000 lbs
Comment: Weight restriction is for Mississippi River toll bridge from Fort Madison, IA to Niota, IL

last updated February 23
 
Road Restrictions - Iowa 141
Iowa 141: between County Roads N36 and N33 and County Road N70
gross weight limit in effect No vehicles over 80000 lbs —
Comment: Carroll County - Only one truck may cross at a time.

last updated June 9
 
Road Restrictions - Iowa 122
Iowa 122 eastbound: between County Road S34 and US 65
gross weight limit in effect No vehicles over 80000 lbs
Comment: Cerro Gordo County - 40 ton weight limit 3.5 miles West of Jct. of U.S. 65 over Willow Creek. Bridges & Structures Office: 1-800-262-0003 ext 1725

last updated March 25
 
Road Restrictions - US 34
US 34: from after IA 906 to before Exit 210 IA 904
height limit in effect
Comment: on US 34 west of Fairfield Height limit of 17' Mt. Pleasant RCE 1-800-224-6021

last updated August 20
 
Road Restrictions - US 169
US 169: between IA 141 and County Road E57
gross weight limit in effect No vehicles over 80000 lbs
Comment: Dallas County - Permanent Weight Limit - All Vehicles. Location on US Highway 169 - 2.9 miles south of junction 141. 1-800-262-0003 ext 1290

last updated April 24
 
Road Restrictions - Iowa 1
Iowa 1: from after US 34 to before County Road H43
height limit in effect Height limit 16 ' 11 "
Comment: Jefferson County Hwy 1 just south of Fairfield vertical clearance of 16'-9" Mt. Pleasant RCE 1800-224-6021

last updated March 5
 
Road Restrictions - Iowa 9
Iowa 9: between County Road X20 and IA 26
gross weight limit in effect No vehicles over 80000 lbs
Comment: Allamakee County - 40 ton weight limit over Mississippi River Bridge in Lansing. Bridges & Structures Office: 1-800-262-0003 ext 1725

last updated March 25
 
Normal Pavement Conditions - Interstate 29
Interstate 29: from before Exit 1: IA 333; County Road J64 to after Exit 151: IA 12; Riverside Boulevard
normal driving conditions

last updated today at 9:05 AM CST
 
Normal Pavement Conditions - Interstate 35
Interstate 35: from before Exit 4: US 69 to Exit 123: I-80
normal driving conditions

last updated today at 6:53 AM CST
 
Normal Pavement Conditions - Interstate 35
Interstate 35: from after Exit 137: I-80 to IA 27; Iowa - Minnesota Border
normal driving conditions

last updated today at 6:53 AM CST
 
Normal Pavement Conditions - Interstate 80
Interstate 80: from before Exit 1A: I-29 to Iowa and Illinois Border
normal driving conditions

last updated today at 6:53 AM CST
 
Normal Pavement Conditions - Interstate 280
Interstate 280: from Exit 290: I-80; US 6 to Iowa and Illinois Border
normal driving conditions

last updated today at 2:59 AM CST
 
Normal Pavement Conditions - Interstate 380
Interstate 380: from Exit 239: I-80 to before Exit 65: US 20
normal driving conditions

last updated today at 6:14 AM CST
 
Normal Pavement Conditions - Interstate 680
Interstate 680: from before Exit 1 130th Street to Exit 27: I-80
normal driving conditions

last updated today at 6:22 AM CST
 
Normal Pavement Conditions - US 6
US 6: from I-480; Iowa and Nebraska Border to before County Road G16
normal driving conditions

last updated today at 6:22 AM CST
 
Normal Pavement Conditions - US 6
US 6: from I-80 to before I-80; County Road X64
normal driving conditions

last updated today at 2:59 AM CST
 
Normal Pavement Conditions - US 6
US 6: from I-280 to I-280
normal driving conditions

last updated today at 2:59 AM CST
 
Normal Pavement Conditions - US 18
US 18: from before IA 182 to after IA 76
normal driving conditions

last updated today at 9:05 AM CST
 
Normal Pavement Conditions - US 20
US 20: from Exit 144: I-129 to before Exit 313: IA 946
normal driving conditions

last updated today at 9:05 AM CST
 
Normal Pavement Conditions - US 30
US 30: from before County Road K45 to before US 67
normal driving conditions

last updated today at 6:53 AM CST
 
Normal Pavement Conditions - US 34
US 34: from after County Road L31 to before Exit 261: US 61
normal driving conditions

last updated today at 6:53 AM CST
 
Normal Pavement Conditions - US 52
US 52: from IA 64 to US 18
normal driving conditions

last updated today at 6:14 AM CST
 
Normal Pavement Conditions - US 52
US 52: from after US 18 to after County Road A18
normal driving conditions

last updated today at 6:14 AM CST
 
Normal Pavement Conditions - US 59
US 59: from before County Road J64 to County Road A10
normal driving conditions

last updated today at 9:05 AM CST
 
Normal Pavement Conditions - US 59
US 59: from County Road A10 to County Road A10
normal driving conditions

last updated today at 9:05 AM CST
 
Normal Pavement Conditions - US 61
US 61: from US 136 to US 151
normal driving conditions

last updated today at 6:22 AM CST
 
Normal Pavement Conditions - US 63
US 63: from before County Road J51 to US 34
normal driving conditions

last updated today at 6:22 AM CST
 
Normal Pavement Conditions - US 63
US 63: from Exit 191: US 34 to after County Road A21
normal driving conditions

last updated today at 6:22 AM CST
 
Normal Pavement Conditions - US 65
US 65: from before County Road J54 to after County Road A34
normal driving conditions

last updated today at 6:53 AM CST
 
Normal Pavement Conditions - US 67
US 67: from after I-80 to US 30
normal driving conditions

last updated today at 2:59 AM CST
 
Normal Pavement Conditions - US 67
US 67: from after IA 136 to US 52
normal driving conditions

last updated today at 2:59 AM CST
 
Normal Pavement Conditions - US 69
US 69: from before County Road R30 to US 65; County Road G58
normal driving conditions

last updated today at 6:53 AM CST
 
Normal Pavement Conditions - US 69
US 69: from after US 65 to before County Road B30
normal driving conditions

last updated today at 6:53 AM CST
 
Normal Pavement Conditions - US 69
US 69: from after US 18 to after County Road R72
normal driving conditions

last updated today at 6:14 AM CST
 
Normal Pavement Conditions - US 71
US 71: from before County Road J64 to before US 20
normal driving conditions

last updated today at 9:05 AM CST
 
Normal Pavement Conditions - US 71
US 71: from US 20 to US 18
normal driving conditions

last updated today at 9:05 AM CST
 
Normal Pavement Conditions - US 71
US 71: from US 18; County Road B19 to after County Road A15
normal driving conditions

last updated today at 9:05 AM CST
 
Normal Pavement Conditions - US 75
US 75: from I-129 to before County Road A16
normal driving conditions

last updated today at 9:05 AM CST
 
Normal Pavement Conditions - US 151
US 151: from after I-80; County Road W21 to US 30
normal driving conditions

last updated today at 2:59 AM CST
 
Normal Pavement Conditions - US 151
US 151: from US 30 to before US 61
normal driving conditions

last updated today at 6:14 AM CST
 
Normal Pavement Conditions - US 169
US 169: from before County Road P32 to US 34
normal driving conditions

last updated today at 6:53 AM CST
 
Normal Pavement Conditions - US 169
US 169: from US 34 to US 30
normal driving conditions

last updated today at 6:53 AM CST
 
Normal Pavement Conditions - US 169
US 169: from after US 30 to after County Road A16
normal driving conditions

last updated today at 6:53 AM CST
 
Normal Pavement Conditions - US 218
US 218: from US 61 to before Exit 239: I-80
normal driving conditions

last updated today at 6:22 AM CST
 
Normal Pavement Conditions - US 218
US 218: from US 30 to before County Road B59
normal driving conditions

last updated today at 6:14 AM CST
 
Normal Pavement Conditions - US 218
US 218: from after County Road B59 to before County Road A23
normal driving conditions

last updated today at 6:14 AM CST
 
Normal Pavement Conditions - US 275
US 275: from before County Road J64 to I-29
normal driving conditions

last updated today at 6:22 AM CST
 
Normal Pavement Conditions - Iowa 3
Iowa 3: from before IA 12 to US 52
normal driving conditions

last updated today at 9:05 AM CST
 
Normal Pavement Conditions - Iowa 4
Iowa 4: from IA 44 to US 18
normal driving conditions

last updated today at 9:05 AM CST
 
Normal Pavement Conditions - Iowa 4
Iowa 4: from after US 18 to after County Road A13
normal driving conditions

last updated today at 9:05 AM CST
 
Normal Pavement Conditions - Iowa 14
Iowa 14: from after US 30 to before County Road D19
normal driving conditions

last updated today at 6:14 AM CST
 
Normal Pavement Conditions - Iowa 27
Iowa 27: from before County Road W62 to Exit 10: US 218
normal driving conditions

last updated today at 6:22 AM CST
 
Normal Pavement Conditions - Iowa 60
Iowa 60: from US 75 to after IA 9
normal driving conditions

last updated today at 9:05 AM CST
 
Normal Pavement Conditions - Iowa 141
Iowa 141: from after IA 144; County Road P58 to after IA 44
normal driving conditions

last updated today at 6:53 AM CST
 
Normal Pavement Conditions - Iowa 330
Iowa 330: from US 65 to before County Road E35
normal driving conditions

last updated today at 6:53 AM CST

©2004 Iowa Department of Transportation

800 Lincoln Way
Ames, IA 50010
General Telephone Number: 515-239-1101
WebSTAT - Free Web Statistics
Zoom In To Des Moines Area
road closed to traffic on US 6 in both directions from County Road V16 to County Road V18 — until November 20 last updated October 7 road construction, road closed to traffic on Iowa 24 at US 18 — until tomorrow at about 4:00 PM CST last updated October 28 road closed to traffic, parade on Iowa 51 from US 18 to IA 9 — starting 4:00 PM, 11/11/09 until Wednesday, at about 5:00 PM CST last updated November 4 road closed to traffic, parade on US 18 from IA 51 to County Road W64 — starting 4:00 PM, 11/11/09 until Wednesday, at about 5:00 PM CST last updated November 4 road closed to traffic, parade on US 52 from County Road X47 to IA 128 — starting 11:30 AM, 11/11/09 until Wednesday, at about 1:30 PM CST last updated November 4 road construction, bridge closed on Iowa 3 at US 169 -- detour in operation — until November 25 last updated September 8 road closed on US 275 in both directions after I-29 due to bridge construction work last updated September 18 road construction, road closed on Iowa 12 at I-29 — last updated September 28 road closed to traffic on Iowa 12 from County Road K18 to before IA 3 due to road construction work -- detour in operation — until November 17 last updated October 30 road construction, roadway reduced to one lane, shoulder closed, width limit in effect, delays on Iowa 130 in both directions from County Road Y52 to I-80 — until November 28 last updated August 4 road construction, roadway reduced to one lane on Iowa 76 from IA 9 to County Road A16 -- pilot car in operation, look out for flaggers — until November 13 last updated yesterday at 9:33 AM CST bridge construction, roadway reduced to one lane on Interstate 35 in both directions from after Exit 56: IA 92 to before Exit 65 County Roads G4R and G14 — until Monday, at about 6:00 PM CST last updated October 16 road construction, roadway reduced to one lane, width limit in effect on US 69 from after IA 160 to before County Road F22 — until December 1 last updated August 11 road construction, night time construction work, roadway reduced to one lane on US 69 from after County Road E57 to before County Road E23 — until December 1 last updated August 25 road construction, bridge construction, width limit in effect, road construction, bridge construction, roadway reduced to one lane, width limit in effect on US 218 from County Road V66 to IA 8 — until November 30 last updated August 14 road construction, night time construction work, roadway reduced to one lane, ramp restrictions in force, width limit in effect, delays on Interstate 80 in both directions at Exit 292: IA 130; North West Boulevard — until November 28 last updated August 5 exit ramp closed on Interstate 29 in both directions at Exit 135 County Road D51 because of bridge maintenance work — last updated August 5 road construction, roadway reduced to one lane, road closed intermittently on US 61 in both directions at County Road F33 — until December 21 last updated October 21 roadway reduced to one lane on Interstate 80 in both directions at Exit 306: US 67 because of bridge maintenance work — last updated September 25 roadway reduced to one lane, single line traffic - alternating directions on Iowa 38 at IA 130 because of construction work — until November 15 last updated October 14 road construction, roadway reduced to one lane on Iowa 24 from US 18 to County Road W14 -- pilot car in operation, look out for flaggers — until November 25 last updated yesterday at 9:37 AM CST road construction, roadway reduced to one lane on US 71 from IA 175 to County Road M50 -- pilot car in operation — until November 30 last updated November 2 road construction on US 218 in both directions from County Road B59 to US 18 because the roadway is reduced to one lane — until November 13 last updated October 15 road construction, roadway reduced to one lane on Iowa 1 from I-80 to County Road F8W — last updated October 6 road construction, roadway reduced to one lane on Iowa 3 from County Road M31 to US 71 -- pilot car in operation — until November 20 last updated September 10 bridge construction, roadway reduced to one lane on US 34 westbound at US 63 — until Monday, at about 5:00 PM CST last updated November 2 road construction, roadway reduced to one lane on Iowa 2 at US 63 — until Monday, at about 6:00 PM CST last updated November 2 road construction on US 18 in both directions from US 65 to County Road S56 because the roadway is reduced to one lane — until November 15 last updated yesterday at 10:34 AM CST bridge construction, night time construction work, roadway reduced to one lane, road closed intermittently, delays on Interstate 74 in both directions from Exit 2: US 6; Spruce Hills Drive to US 6 — until December 31 last updated August 6 road construction, roadway reduced to one lane on Interstate 80 from after Exit 164: US 6 to before Exit 173: IA 224; County Road T22 — until Tuesday, at about 10:00 AM CST last updated October 2 bridge construction, roadway reduced to one lane, night time construction work, width limit in effect on Interstate 80 westbound at Exit 267: IA 38; County Road X54 — until September 13, 2010 last updated August 4 exit ramp closed on Interstate 29 northbound at Exit 95 County Road F20 because of construction work — last updated September 23 road construction, roadway reduced to one lane on US 63 from IA 92 to IA 146 -- pilot car in operation, look out for flaggers — until Monday, at about 6:00 PM CST last updated November 2 road construction, roadway reduced to one lane on Iowa 143 from IA 3; County Road L36 to IA 10 -- pilot car in operation, look out for flaggers — until Tuesday, at about 7:00 PM CST last updated October 28 road construction, roadway reduced to one lane, road closed intermittently, width limit in effect on US 30 in both directions from US 67 to US 67 — until December 15 last updated October 27 road construction, shoulder closed, roadway reduced to one lane, temporary traffic lights on Iowa 26 from IA 9 to County Road A26 -- look out for flaggers — until November 18 last updated August 18 road construction, roadway reduced to one lane, width limit in effect on Iowa 44 in both directions from IA 4 to US 169 -- pilot car in operation, look out for flaggers — until November 16 last updated October 26 road construction, night time construction work, roadway reduced to one lane, width limit in effect, delays on Interstate 74 in both directions from Exit 298: I-80 to Exit 4: US 67; Grant Street and State Street — until December 31 last updated July 22 road construction, roadway reduced to one lane on US 61 in both directions at County Roads Y68 and E73 — until November 20 last updated October 27 roadway reduced to one lane on US 30 in both directions between I-29 and County Road F58 because of road maintenance activities — until Monday, at about 6:00 PM CST last updated October 5 road construction, night time construction work, roadway reduced to one lane on US 65 from after IA 92 to before US 69 — until December 18 last updated July 9 road construction, roadway reduced to one lane, speed restrictions in force on Interstate 35 in both directions from Exit 36: IA 152; County Road R35 to Exit 56: IA 92 — until November 13 last updated October 30 road construction, night time construction work, roadway reduced to two lanes, road closed intermittently on Interstate 380 southbound at Exit 18 Wilson Avenue — until November 27 last updated November 2 bridge construction, night time construction work, roadway reduced to one lane, road closed intermittently, width limit in effect on US 6 in both directions from US 61 to I-74 — until December 16 last updated November 2 road construction, roadway reduced to one lane, width limit in effect on US 34 in both directions from US 59 to County Road M37 — until November 16 last updated November 2 road closed to traffic on Iowa 4 in both directions from County Road B14 to IA 9 due to road construction work — until November 13 last updated November 2 road closed to traffic on US 65 in both directions from IA 3 to County Road C31 due to road construction work — until November 30 last updated yesterday at 10:08 AM CST road construction, single line traffic - alternating directions on US 63 from US 30 to IA 96 — starting 7:00 AM, 11/09/09 until November 20 last updated November 4 road construction, roadway reduced to two lanes, width limit in effect on US 61 in both directions at County Road X23 — until November 12 last updated October 12 road construction, lane closed on US 218 from IA 3 to IA 188 — until November 16 last updated October 2 road construction, roadway reduced to two lanes, width limit in effect on Interstate 80 in both directions from Exit 244 Dubuque Street to before Exit 246: IA 1; Dodge Street — until November 15 last updated August 25 road construction, single line traffic - alternating directions on Iowa 14 from County Road F17 to US 30 -- pilot car in operation — starting 7:00 AM, 11/16/09 until November 25 last updated October 28 width limit in effect, roadway reduced to two lanes on US 63 from after County Road G55 to before IA 92 last updated October 6 road construction, width limit in effect, single line traffic - alternating directions on US 30 in both directions from US 63 to County Road V42 — until November 20 last updated October 8 road construction, lane closed on Iowa 13 from IA 3 to IA 56 -- pilot car in operation, look out for flaggers — until November 20 last updated October 28 road construction, lane closed on US 20 at Exit 227: US 63; Seargeant Road — until November 13 last updated October 28 roadway reduced to two lanes, bridge construction on US 18 in both directions at US 218; County Road T44 — until November 13 last updated November 2 bridge maintenance operations, single line traffic - alternating directions, width limit in effect on Iowa 92 in both directions at IA 1 — until Monday, at about 6:00 PM CST last updated November 2 road construction, width limit in effect on Interstate 29 in both directions from Exit 71: I-680 to Exit 75: US 30 — until December 17 last updated August 17 bridge construction on US 65 in both directions between IA 122 and County Road B20 — until November 20 last updated July 7 road construction, bridge construction on Interstate 29 in both directions from Exit 35: US 34; US 275 to Exit 42: IA 370; County Road H10 — until December 1 last updated October 29 road construction on Iowa 83 from US 59 to IA 173 -- pilot car in operation, look out for flaggers — until November 15 last updated October 29 height limit in effect on US 218 in both directions between County Road W64 and County Road G36 last updated November 3 road construction, bridge construction, width limit in effect on Interstate 29 in both directions from Exit 61: I-680; County Road G37 to Exit 71: I-680 — until December 1 last updated August 21 road construction, speed restrictions in force on Interstate 80 westbound from after Exit 230 County Road W38 to before Exit 237 Ireland Avenue — until November 15 last updated October 22 road construction, width limit in effect on US 30 eastbound from IA 21 to US 218 — until November 16 last updated September 9 road construction, width limit in effect on US 18 in both directions from US 75 to IA 60 — until today at about 7:00 PM CST last updated June 3 road construction on Iowa 17 from after County Road E18 to before IA 175 -- pilot car in operation, look out for flaggers — until November 20 last updated October 23 height limit in effect on US 30 in both directions between US 63 and County Road E66 — last updated June 30 bridge construction, road construction on US 30 in both directions between County Road P46 and County Road P54 -- watch, follow special detour markers — until November 30 last updated October 23 bridge construction, width limit in effect on US 169 at County Road D20 — until November 20 last updated September 18 road construction, width limit in effect, right lane closed on Interstate 80 from Exit 191: US 63 to Exit 205 County Road V38 — until November 20 last updated October 30 gross weight limit in effect on US 20 between County Road N65 and County Road P13 last updated March 25 road construction on Iowa 175 from IA 17 to before US 69 -- pilot car in operation, look out for flaggers — until November 20 last updated October 23 left lane closed on US 18 in both directions between US 71; County Road B19 and US 71 due to work on underground cables last updated November 5 height limit in effect on Iowa 1 from US 34 to County Road H17 — last updated October 16 road construction, opposing traffic sharing the roadway on Interstate 35 from Exit 22 County Road J14 to Exit 33: US 34 — until Wednesday, at about 6:00 PM CST last updated October 22 height limit in effect on US 71 from after County Road D54 to before County Road D54 last updated October 7 road construction, bridge construction on Interstate 29 in both directions from Exit 24 County Road J10 and L31 to Exit 32: US 34; IA 978 — until December 1 last updated August 17 road construction on Iowa 175 from after US 169; County Road P61 to before IA 17 -- pilot car in operation, look out for flaggers — until November 20 last updated October 23 width limit in effect on Iowa 2 after US 61 last updated December 8 bridge construction on US 20 in both directions from Exit 4: US 75 to County Road K42 — until November 15, 2010 last updated August 13 gross weight limit in effect on Iowa 141 between County Roads N36 and N33 and County Road N70 — last updated June 9 road construction, night time construction work on US 151 from I-80; County Road W21 to US 6 — last updated May 28 road construction on Interstate 29 in both directions from Exit 15 County Roads J26 and L31 to Exit 24 County Road J10 and L31 — until December 1 last updated September 30 gross weight limit in effect on Iowa 2 after US 61 last updated February 23 road construction, night time construction work on Interstate 80 in both directions from Exit 225: US 151; County Road W21 to Exit 240: IA 965; Coral Ridge Avenue — last updated May 28 road construction on Interstate 29 from Exit 149 Hamilton Boulevard to Exit 151: IA 12; Riverside Boulevard — last updated September 28 road construction on Interstate 80 in both directions from Exit 1A: I-29 to Exit 40: US 59 — until November 18 last updated October 15 road construction, width limit in effect on Interstate 29 in both directions from Exit 112: IA 175 to Exit 127: IA 141; County Road K42 — until November 15 last updated July 27 road construction on US 69 from IA 175 to before County Road D41 -- pilot car in operation, look out for flaggers — until November 20 last updated November 5 road construction, width limit in effect on Interstate 29 from Exit 95 County Road F20 to Exit 112: IA 175 — last updated September 24 road construction on US 65 in both directions from IA 9 to County Road A34 — until November 30 last updated November 3 gross weight limit in effect on Iowa 122 eastbound between County Road S34 and US 65 last updated March 25 height limit in effect on Iowa 1 from after US 34 to before County Road H43 last updated March 5 gross weight limit in effect on Iowa 9 between County Road X20 and IA 26 last updated March 25 gross weight limit in effect on US 169 between IA 141 and County Road E57 last updated April 24 height limit in effect on US 34 from after IA 906 to before Exit 210 IA 904 last updated August 20